By FDtech · 11 November 2026
When a drawing changes during a fabrication enquiry, link the change to the affected parts and clarify when it should apply. A new attachment alone does not explain whether it replaces the whole document package, concerns one component or still needs discussion. Before proceeding, obtain acknowledgement of the documents and activities involved.
This guide proposes a handover record for technical teams, purchasing and suppliers. It addresses changes after an initial enquiry. For the initial material, quantity and finishing information, see the stainless steel fabrication quotation guide.
Link the drawing to the affected supply
List the affected components with their part codes, previous revisions and new revisions. Add the enquiry or order reference and the quantity involved. If the change concerns only part of a batch, say so explicitly: a new drawing revision does not automatically mean every part must be remade.
Avoid identifying a version only as “final”. A file may have been renamed without its contents changing, while a PDF and its associated model may have been exported at different times. Put the technical reference in the list and check it against the documents themselves.
The Onshape documentation on revision tables illustrates how drawing revisions can be recorded. It is an example of a documentation tool, not evidence that every supplier uses that software or procedure.
A record for communicating the change
| Field | Information to share | Acknowledgement to request |
|---|---|---|
| Component | Code, previous and new revision | Which parts are affected |
| Documents | List of updated drawings, models and specifications | Package received and readable |
| Differences | Changed dimensions, holes, joints or finishes | Details to clarify before work |
| Progress | Enquiry, order or batch reference | Operations already completed, if any |
| Decision | Contact able to confirm the solution | Agreed next step |
Adapt this record to the job. It is not an FDtech procedure already agreed with the customer. Keep unknown information visible: “production status to be checked” is more useful than assuming work has not started.
Describe differences and resolve conflicts
Accompany the new drawing with a short note identifying the changed areas. For a support bracket, for example, you could highlight revised fixings and ask which connected elements need reassessment. This is a hypothetical communication example, not a completed customer project.
The note helps readers find the changes; requirements needed for manufacture should remain in the agreed documents. If the drawing and model show different geometries, do not choose whichever file has the newest timestamp. Ask the technical contact to resolve the conflict and identify the reference for each requirement.
Comparison tools can help locate geometric differences. The PTC guide to revision checking describes one application. Detecting a difference and authorising a change remain separate steps.
When production has already started
Ask about the actual status of the parts before agreeing how to apply the new version. Prepared stock, cut components and completed assemblies require different assessments. A file change cannot automatically be transferred to an existing part.
Discuss which activities should await clarification, what should happen to completed components and whether cost, availability or scheduling need review. For work FDtech places with third parties, the document handover must also account for the appointed provider. Laser cutting, tube laser cutting, turning, milling and plate rolling are carried out by third parties.
Keep the supplier’s acknowledgement with the document list. That reference helps avoid returning to an older version during a repeat enquiry.
Discuss an updated drawing with FDtech
The technical drawing and project support service provides an opportunity to discuss requirements and potential issues before production. Explain what changed, which parts are affected and which decisions remain open, then request a project discussion. Describe the available documents in the form and agree how to share them afterwards: the form has no attachment upload field.
